Preparation

Lay six utility slabs on a prepared base

Lay six utility slabs on a prepared base

Author: Waey TeamPublished:

Lay whole Pendle concrete flags on full wet mortar beds within a suitable prepared edge frame. Check actual slab sizes, retain the designed falls, prime the backs and finish rigid joints before protecting the pad through curing.

Intermediate · One working day plus bedding, jointing and protected curing time; allow at least seven days after final wet work before use, longer if the materials or conditions require
Start learning →
Fit a small patch of click-together outdoor tiles

Fit a small patch of click-together outdoor tiles

Author: Waey TeamPublished:

Assemble nine whole plastic RUNNEN tiles with matching rounded edging on an existing sound, even outdoor concrete floor. Learn connector orientation, two edging arrangements and a removable finish without cutting or wet mortar.

Beginner · About 1–2 hours after site checks and cleaning; no mortar curing
Start learning →
Rebuild and relevel a settled concrete-block garden path

Rebuild and relevel a settled concrete-block garden path

Author: Waey TeamAdded:

Lift a suitable bounded pedestrian path, correct the supporting layers and relay its whole blocks with controlled levels, dry joints and protected final compaction.

Intermediate–advanced · site-dependent work and equipment
Start learning →